Showing posts with label Harvard. Show all posts
Showing posts with label Harvard. Show all posts

Thursday, June 5, 2014

PBH Weatherization Project

Back in 2010 I lead a project to work with Harvard students to weatherize the Philips Brooks House. It was a great project with over 50 students attending (including the woman who is now my wife, a post-doc at HSPH at the time) and lots of energy saved. The case study won AASHE's first Campus and Student Sustainability Award for “Best Campus Case Study”. Before the big day, I reached out to Jim Merchant of Pirates Lane (http://pirateslane.com/) who agreed to attend and prepare a video. While looking for something else today I ran across the video and was saddened to see that it had far fewer views than my last cat video (our cat Magilla Glub Glub has a Facebook page). Anyway, with that in mind, I'm sharing the case study and link to the video here. Special thanks to the Green Building Services team for all of their work before, during and after the event. Enjoy.

Case Study on AASHE site:
http://www.aashe.org/resources/case-studies/phillips-brooks-house-student-weatherization-project

Video (about 10 minutes long):
https://www.youtube.com/watch?v=YftpU-fkahU


Phillips Brooks House Student Weatherization Project


Institution(s)

Harvard University

Author(s)

Nathan Gauthier, Assistant Director, Office for Sustainability, Harvard University
       

Project Overview

On May 2nd, more than 50 Harvard students took a break from studying for finals and picked up caulk guns to help improve the energy efficiency of the Phillips Brooks House in Harvard Yard. The project was a collaboration between the Office for Sustainability, the Phillips Brooks House Association, the student Environmental Action Committee, and the Faculty of Arts and Sciences Green Program. Student labor was used to implement 23 weatherization projects in the building. The project is estimated to save more than 9 tons of CO2 equivalent and nearly $4,000 in utility costs annually.

Background

The project was initiated when students from the Environmental Action Committee (EAC) approached the Office for Sustainability and Faculty of Arts and Sciences Green Program asking if there was a way to involve students in a weatherization project similar to what is done by Cambridge Home Energy Efficiency Team (http://heetma.com/). The OFS team toured the building and identified nearly 40 practical energy conservation measures for the Phillips Brooks House, which is a 12,800 square foot, 100 year old, brick building. OFS then designed a program to work with students and issued a proposal to the FAS Office of Planning and Physical Resources to work with EAC students to plan and execute a student-lead weatherization event that would significantly improve the building's performance while engaging students in the process.

Project Goals

The primary goal of the project was to engage students and help them feel empowered to make a positive change on their campus. OFS and FAS wanted students to feel vested in the University's greenhouse gas reduction goal and to encourage them to do their part. The students wanted to have their contributions acknowledged and be exposed to the nuances of building operations and the details around how buildings operate and what opportunities exist to improve building performance. Additional goals included reducing the greenhouse gas emissions and operations costs of the Phillips Brooks House. An added benefit was receiving positive press highlighting student and administrative collaboration.

Project Implementation

Of the nearly 40 energy conservation measures identified for the building, more than 20 were selected on the basis that they could be safely and effectively implemented with student labor. The OFS and student planning team began weekly meetings to organize the project. OFS coordinated with Environmental Health and Safety on student safety issues, the Office of General Council on liability issues, Human Resources on labor relation issues and negotiating with the trade unions, and Facilities Maintenance Operations to identify technical resources that would be beneficial to project success. Cambridge HEET, a local non-profit that specializes in home weatherizations, was consulted to share lessons learned and to provide pre- and post-project blower door testing.



On the day of the event, participants were organized into 7 teams, each led by an OFS staff member and a student leader who had been trained on their tasks ahead of time. The 50 plus student volunteers were trained on safety protocols, tool use, and how to implement the ECMs and then supervised as they performed the work. Projects included caulking storm windows, installing low-flow plumbing fixtures, replacing lamps with compact fluorescents or low-mercury super T8 linear fluorescents, sealing a chimney, installing door sweeps and door jambs, insulating steam pipes, adding smart power strips on computers and timers on water coolers, installing educational signage, and many others. OFS staff was on hand to take photographs and a local videographer responded to a Craigslist ad asking for a volunteer to make a short film. Two full-time interns from Wentworth Institute of Technology worked with OFS throughout this project including helping lead weatherization groups on the day of the event.

Timeline

The project was on a very aggressive timeline because it needed to be implemented before students left for the summer. Students approached OFS and FAS in the last week of February, 2010. OFS Green Building Services walked the building on March 8 and issued a proposal complete with nearly 40 potential ECM opportunities on March 17th. The proposal assumed almost 200 hours of OFS staff time to complete the project with all of the recommended components. FAS approved the proposal the next day (3/18/10) and the OFS team began planning for the event. On March 23, OFS sent the student organizers a detailed description of the proposed process going forward and asked for contact information for student team leaders for the day of the event, as well as for their recommended date for the event and times for weekly team meetings. On March 26 the student organizers provided much of the information requested, though a date for the event wasn't finalized as we tried to coordinate availability of the building with OFS staff availability and student breaks. Student organizers and OFS began weekly breakfast meetings to go over project details, with FAS Office of Physical Planning and Cambridge HEET attending one meeting each to lend their assistance and get updates. By the first week of April, OFS staff and student leaders began visiting the building to put together detailed lists of materials needed to implement their projects and perform practice runs to ensure everybody knew how to perform the tasks for which they were responsible. On March 24th, OFS lead a larger group of students around the building to review all projects identified, including those identified but not being implemented as part of the student project such as demand control ventilation in the lounge area or variable frequency drives on the heating hot water loop. OFS had completed energy calculations for all projects and costed out the materials needed in order to share this information with the students and help them understand the utility cost and greenhouse gas reduction potential of each measure as well as their cost effectiveness. In the middle of April, May 2nd was selected as the day of the event. This was a Sunday during the reading period prior to exams. Invitations to attend were sent to the environmentally themed students groups on April 15th with an online sign up sheet using Google Docs. Materials were purchased during the last two weeks of April. The project took place on May 2, from 11:00 to 3:00, with OFS arriving at 9:00 to start setting up and staying to 4:00 to clean up. Coffee, juice and pastries were awaiting students at sign in and Veggie Planet rice dishes during the lunch break.

Financing

All funding was provided by the FAS Office of Planning and Physical Resources, paid out of their operating budget.

Annual savings are estimated at $3,750 in annual utility costs. We did not quantify the additional maintenance savings from re-lamping all 250 lamps in the building. None of our projects were expected to have an increased maintenance cost. We also did not try to quantify the improved productivity from staff being more comfortable or the benefits of educating students and how this might influence their behaviors going forward.

The total materials cost for the project was $3,300, of which $2,800 was billed to the FAS with the idea that remaining cost went towards tools that could be reused for future projects and would be paid for by OFS. This material value paid by FAS includes the cost of 7 new storm windows, which was not a project performed by the students but was critical to ensure the students caulking the storm window frames knew that their efforts were not in vain. This value also includes the $500 for lunch and $50 for breakfast. Most materials were purchased through Grainger, with additional materials purchased through Energy Federation Incorporated, Home Trends, Watertown Plumbing Supply, Home Depot, Staples, and Conservation Technology.

OFS staff put in 202 hours of time into the project, 192 of which were billed to FAS because of our not to exceed contract agreement. Facilities Maintenance Operations charged for 6 hours of work to have their plumber and pipe wrapper on-site on the day of the event.
Total project costs were $24,043, most of which was from labor.

Project Results

More than 50 students attended the May 2nd event, in addition to the more than a dozen student group leaders, OFS staff, and the Wentworth Interns. The initial, conservative estimates expected a reduction of 9 metric tons of CO2 equivalent of greenhouse gas emissions and $3,750 in utility costs per year. While full verification of the energy reduction may take a year to assess, the building was given a pre- and post-project blower door test to quantify air leakage. The test showed nearly 1,800 fewer cubic feet of air coming into the building when under pressure after the project, which translates to nearly 180 square inches of gaps in the building envelope that were filled… truly excellent results. The bulk of the benefit will be in the winter, when the significant reduction in infiltration will result in steam savings. Everybody responding to the lessons learned survey indicated that they thought the project was very valuable to students and that they hope it is replicated again next year.

Lessons Learned

After the project, a lessons learned survey was sent out to all of the OFS staff and student organizers. 73% of the respondents felt the project was good (4 / 5) and the remaining 27% felt it was excellent (5/5). All respondents indicated that it was a good project that they would like to see repeated.
There were multiple suggestions about broadening the outreach to include faculty and staff, as there were none at the event. The project would have also benefited from having the date confirmed earlier so the outreach could have been done over a longer period of time. Even with very little notice, more than 50 students attended on a Sunday when studying for finals, which seems to indicate there is a lot of interest in this type of event.

Additional time all around would have made the project go more smoothly and would have also likely reduced the cost to FAS as we had to invest significant and possibly redundant resources in order to get everything done on time. While we were able to successfully execute all 23 projects, we had multiple people working on the same or similar tasks for different projects when some of this could have been streamlined if time allowed.

There were a few minor issues during the event with ECMs that didn't go exactly as expected (pipe insulation not quite fitting, dual flush handles not working with all of the toilets, etc.). If we repeat this project, we'll make sure the dry runs in the weeks leading up to the project are more in-depth and can actually confirm the feasibility and the correct parts for all projects. We'll also make sure to order the parts further in advance. One of the packs of lamps we ordered for the chandeliers didn't have the fixture adapter and we didn't have the extra lamps on hand we were expecting.

Another lesson learned was about the door weather seals and students using the drills. It was hard to drill through the steel kick plate without using the more aggressive drill bits, but it was also really hard for students to stop the drill at the right depth. In the future, we'd like some sort of depth guide on the drill to reduce this over-drilling.

Because the blower door test was a bit of an after-thought, we couldn't get Cambridge HEET out on the day of our event. While they were able to come beforehand and afterwards, in the future we would like students to be able to see the actual test and witness the improvements.

 
The film that was made for us by Pirates Lane Video turned out really nicely and putting an ad on Craigslist for a volunteer videographer worked well. We had more than a dozen people volunteer their services. In the future, we'd like to have an OFS staff walk around with the videographer to make sure he's able to film all of the projects. We would have also liked filming of the predatory planning meetings if possible.

We created educational signage and a poster summarizing all of the projects for the students. These sorts of occupant engagement efforts partnered very well with the more typical energy conservation measures and helped make for a more complete event.

We were able to get reusable cups and glasses from Harvard University Hospitality and Dining Services and used all compostable plates and silverware (with composting bins that the OFS staff took home afterwards and brought back to work on Monday). All of the dishes from Veggie Planet for lunch were vegetarian. A number of students commented on appreciating that we made sure to use sustainable dining practices and this is of course something we'd like to do again in the future. A number of people also mentioned that it might be easier to eat pizza instead of rice dishes while outside working.

There were also comments about the project being more for awareness than energy savings, and it may have been nice to have contractors there actually implementing some of the more significant energy saving opportunities at the same time. We identified another 15 to 20 projects that had good payback and would save significant energy, but would require a professional contractor to implement. It might be worth combining the installation wtih the student work in the future. It is also worth noting that the vast majority of the project costs came from planning the weatherization event and not from the actual materials. Using student labor to thoroughly weatherize a building in this manner does not seem to be the most cost effective way to get the job done assuming you have to pay for the staff time needed for planning. The benefits, of course, go well beyond the immediate energy savings from the ECM projects.

There were a few ECMs that really only allowed a couple of people to work on them at a time. In order to engage more students, we would have needed more team leaders and possibly more tools (such as drills). This was only true for a couple of projects like the plumbing projects or door sweeps, but something to keep in mind. Trying to keep 50 or more students engaged simultaneously requires a lot of advanced planning and a lot of knowledgeable leaders.

A critical lesson to share is that early coordination with all stakeholders is critical and that doing so allowed the project to happen without any last minute concerns or hang ups. It requires motivated student leaders, knowledgeable sustainability staff, and facilities leader willing to invest in this kind of project (thank you Jay Phillips). If coordinated with all parties early, potential obstacles can be identified and solutions suggested.

Everybody involved felt this project was a success and that future projects would be even better. It is difficult to succinctly share all of the lessons learned, but the OFS team is very optimistic that if we were able to do a similar event in the future they'll be even more successful than the first.

Thursday, January 19, 2012

Paper on Energy Modeling Barriers

Holly Samuelson and team at the Harvard Graduate School of Design recently presented a paper on "Identifying Non-Technical Barriers to Energy Model Sharing and Reuse".  This is a topic dear to my heart as while I was at Harvard I chaired the Green Building Standards committee and wrote the language requiring all major renovation and new construction projects to submit as-built energy models in electronic format as part of their closeout documents.  We also recommended projects to use eQuest or Energy Plus unless they had a defendable reason why one of these programs wasn't viable.  As far as I know, this was the first such requirement and nobody really know how the industry would react.  Holly and friends took this idea and surveyed 154 energy modelers to see what they thought about sharing energy models.  A whopping 75% of the respondants indicated that they would share these files.  Those that wouldn't share gave a range of reasons including (in decreasing order of prevalence) that the models are too complicated to be understood by others, the models don't represent reality in the finished building, the model itself represents intellectual property not to be shared, and finally a couple of engineers felt that owners do not have staff qualified to receive the model (though I'm sure this is almost universally the case).  I spoke with Holly years ago when she was initially contemplating the paper and survey and she gave me a shout out in the acknowledgements for my help.  She also acknowledged fellow EA TAG member Chris Schaffner (the Green Engineer). Thanks Holly and keep up the great work.

Sunday, September 19, 2010

Commissioning Data Center

Last week we walked around the new data center for the management company to perform pre-functional and functional testing (depending on the equipment). The UPS still couldn't be tested because there were still issues with a transfer switch. We looked at the 4 CRAC units, one of which was still hooked up to the vacuum to remove moisture before being re-charged with refrigerant. The two larger CRACs had to have their refrigerant removed, be cut in half to get in the elevator, and then re-assembled. There were a couple of problems with the wiring of one of these, the result of a wiring harness being re-installed improperly. Both of the large units needed to have insulation added since it was removed when it was cut (photo to the right). There was also a very small domestic water copper pipe used for humidification that should be insulated and secured to the frame so that it didn't vibrate against the frame and eventually wear through (photo on the left - the larger diameter pipe was secured with a vibration dapening clamp). One of the large CRAC units was moving 16% less air than it should and the motor was going to be re-shived to fix.

Another of th
e issues we looked for were un-sealed penetrations in the floor and ceiling since both were being used as a plenum for supply (floor) and return (celing) air. The floor was sealed pretty good with only a couple of penetrations that were missed (photo on the left), but the ceiling had lots of unsealed penetrations (photo on the right). Kevin Sheehan (on the ladder) and Kevin Bright (in the floor) are using a flashlight to look for these issues in the photos below.





















Another issue we identified during this trip was the chilled water pressure gauges, which were supposed to be 6" diameter and instead were 4" diameter. Obviously this isn't a huge deal, but they were pretty clearly called for in the spec and we've asked the contractor to replace.



Sunday, November 22, 2009

HRES Solar Thermal


On Friday, Andrea Ruedy Trimble, Jessica Parks, Carol Healy, Zhen Wu, Mitch Hunter, and Fady Ghattas of the Harvard Office for Sustainability took a tour of the solar thermal installations on 472-474 Broadway and 20-20a Prescott Streets in Cambridge. Bjorn Storz of Harvard Real Estate Services lead the tour. There are 14 flat plate collectors on the two roofs and they are expected to provide 30 to 40% of the domestic water demand. The solar planels collect heat through a glycol loop which is pumpted to plate frame heat exchangers in the basements. From there a water loop transfers heat to storage tanks. Finally, another set of plate fram heat exchangers transfers the heat to pre-heat the domestic water, which receives additioanl heating from natural gas boilers. The installation is expected to reduce GHG emissions by 13 MTCDE per year and save 2,300 therms of natural gas.

The systems performance is being tracked real time and available on the web. The public is invited to track the performance of the system by visiting http://harvard_prescott.heizwerk.at/ and logging in with username "frei" and password "frei". Solid Solar, the manufacturers, are continuing to monitor the system from Germany and making slight tweeks to the controls to optimize its performance.

Everybody on the Office for Sustainability staff enjoyed the tour and hopes to see more such installations on roofs around Harvard and elsewhere.

Read more.

Saturday, September 12, 2009

LEED for Homes Platinum


Walked by 2 Grant Street the other day. This is Harvard's first LEED for Homes Platinum building. It was a full-gut renovation of a 1,000 square foot house originally built in 1867. The project used a Mitsubishi Heat Recovery Ventilator (HRV) to ventilate the house in an energy efficient manner (pictured). This is a preferred method of ventilation compared to ventilating by leaving the building envelope really leaky (the more common method) and is especially effective in a hot-roof application where insulation is applied directly to the underside of the roof (as was done in 2 Grant). The project uses a high efficiency condensing furnace (95.5% efficient) for heat and air conditioner (13 SEER) for cooling and Icynene spray insulation to improve the envelope performance. Domestic hot water is provided by an instantaneous water heater as needed by the occupants (no storage tank) and all appliances were selected to be Energy Star rated. The team selected all low-emitting materials and otherwise environmentally friendly materials, water efficient fixtures (saving 40%), and carefully designed the project to be durable and avoid mold or moisture damage. This is only the second LEED for Homes Platinum at any university and the fist renovation.

Monday, August 10, 2009

After Dark Interview

My first (and only) TV interview is now available on the web. Holly Hurley of After Dark conducted an interview this winter for a segment titled "Conservation in Brookline." The entire interview, which is hopefully edited to make me look smarter in the actual TV show, is posted on the BASEnet website.

Thursday, August 6, 2009

Talk at GSD


Our director and I guest lectured on Wednesday this week in the Planning and Building Sustainable Campuses executive education class at the Harvard Graduate School of Design. About 20 students attended the class, which was organized by Dan Kenney and a team from Sasaki Architects. My part of the lecture is attached. I'd taken the group on a tour of Rockefeller Hall (soon to be LEED NC v2.2 Gold) to the same group on Tuesday. Roy Lauridsen of the Harvard Divinity School met us at the building and lead the tour.

Tuesday, August 4, 2009

Holyoke 4th Floor Commissioning


This morning we conducted functional testing as part of our commissioning of the Holyoke Center 4th Floor fit-out. During the electrical portion of the commissioning, we confirmed all occupancy sensors were working correctly and set to the proper timing (the first project we've looked at with all occupancy sensors working correctly before commissioning). However, we noticed that the light fixtures were not dimming up and down based on the presence of daylight as they were supposed to. It turns out they needed to be set up with the photosensor tool before they'll dim, but this had not been done. We were able to work with the lighting installer and have them set the minimum (nearly off) and maximum (set to provide just over 50 foot candles at the work surfaces rather than fully on) levels for each fixture. We also made sure operating the daylight responsive dimming feature was added to the operator training planned for the next day.


Monday, July 27, 2009

SCUP Conference


Last week at the SCUP conference we presented on the Hamilton Hall project from the Business School. The architect, Nancy Goodwin of Finegold Alexander + Associates, started by introducing the project and it's LEED gold rating. Ken Beck, project engineer from BLW Engineers, followed with a talk about the building's controls, which included the first use of occupancy sensors to control thermostats on campus. I followed with a look at how the Buisiness School and the University leveraged the initial successes from Hamilton Hall into bigger successesses in future projects and eventually into campus-wide policy changes. A copy of the presentation can be found here.

Friday, July 10, 2009

BCA Commissioning Requirements

Posting on BCA Group at LinkedIn: There has been a lot of discussion about the BCA's certification being too difficult to obtain. The Certification comittee is looking for ways to make the certification easier to obtain without sacrificing the integrity of the certification. Ideas?

Response: As someone who has worked with a lot of bad commissioning authorities, I think the BCA certification requirements are great. How many projects have a commissioning authority sign off despite never having an OPR or BOD? How many CxA's use the nominal group technique to facilitate development of the OPR? How many CxA's use Guideline 4 to prepare the systems manual? CxA's that confirm As-Builts are As-Built? CxA's that suggest envelope commissioning in a complex building? I think the BCA and U of Wisconsin certifications give educated owners a level of confidence in their consultants and help give the industry a better image. I've worked on lots of clients who feel (after paying for bad commissioning) that it was a worthless investment though I'm convinced and the data supports that good commissioning is the smartest investment an owner can make. Nathan

Thursday, July 9, 2009

Presentations

Somebody recently asked for a copy of our GreenBuild 2008 presentation. For a copy, please click here. While I'm at it, here's a copy of an old "Green Buildings at Harvard" presentation (very outdated now).

"Advertising" Green Buildings

Question: I work for the Office of Sustainability at ### University. I was wondering if you could direct me to the individual in your office who would know about green building done at Harvard. Specifically, I'm interested to know if any of the Harvard's green buildings have innovative ways of advertising their innovations.

Response:

We have a pretty big campus and over 60 green building / LEED projects and each advertises their innovation a little differently. We have real time utility displays in some:

http://buildingdashboard.com/clients/harvard/byerly/

http://buildingdashboard.com/clients/harvard/cowperthwaite/

http://buildingdashboard.com/clients/harvard/10akron/

All completed projects get case studies (eventually):

http://www.green.harvard.edu/theresource/case-studies/

We put the technologies used in an online database:

http://www.green.harvard.edu/theresource/tech-prod/

And a lot of projects have comprehensive signage programs, lab hood CFM displays, tours that are publicly available, etc. We usually try to write an article about new projects for our website:

http://www.green.harvard.edu/node/35

We then try to link to this site on the AASHE bulletin.

http://www.aashe.org/publications/bulletin.php

A couple of years ago we published a map of all our green building projects in the Harvard Gazette (click on the image on the bottom right):

http://www.news.harvard.edu/multimedia/specials/green/index.html

Hope this helps,

Nathan

Friday, May 22, 2009

Dunster Kitchen Controls

Our Dining Services group recently worked with National Resources Management to reduce energy consumption in their kitchens. They put in controls to to reduce short cycling of the walk-in cooler and freezer compressors, run the evaporator fans only when needed, and run the defrost cycle based on coil temperature. NRM also installed anti-sweat door heater controls and replaced the small evaporator fans with much more efficient Electronically Commutated Motors (ECM) motors, as is being done in the picture on the right in a cooler at Dunster House, where 2 coolers and 2 freezers were upgraded. The new controls are able to be monitored remotely to track refrigerator and cooler performance and to verify energy savings (the small image on the bottom right shows a screen shot tracking the Dunster House kitchen). The overall project covered 14 walk-in coolers and 8 walk-in freezers in 4 kitchens, cost about $80,000 after utility rebates, is estimated to save over $28,000 annually (simple payback in less than 3 years), and will reduce greenhouse gas emissions by over 62 metric tons of carbon dioxide equivalent per year. Details of the Dunster project are included on the bottom left. The whole project was funded through the Green Campus Loan Fund and the loan will be repaid as the energy savings are realized.

Thursday, April 9, 2009

Dual Flush in Egypt

This dual flush toilet photo was taken in Egypt and sent in by Fulbright Scholar Alicia Harley (formerly of the Harvard Office for Sustainability). We don't know / can't read the make, model or flow, but it looks like a tank-type toilet (gravity fed) with the tank in the wall between the wall studs. We assume the larger button gives a half flush (probably a 6 liter "solid" flush and a 3 liter "liquid" flush). Alicia is in Egypt working on the issue of access to safe drinking water, so it is good to see they're reducing the amount of potable water used in their toilets. Thanks Alicia

Wednesday, April 8, 2009

Low Flow Showers


The Malcolm Athletic Center (MAC) at Harvard University has replaced all of its shower heads with low-flow versions. They use the Delta H20 Kinetic showers, which are rated at 1.6 gallons of water per minute at 80 psi pressure, down 36% from the 2.5 gpm standard in the United States. As a user of the facilities, I can say that the old showers aren't missed.

Friday, April 3, 2009

Fume Hood Ventilation


The Jacobsen Lab in Harvard University's Mallinckrodt Building uses Mott variable volume fume hoods to help save energy by reducing the volume of air being exhausted (and as a result reducing the fresh air brought into the space that needs to be heated or cooled) as the hood sash is closed. The hoods are saving additional energy by having air movement with 80 feet per minute face velocity entering the hood, reduced from the typical 100 fpm or higher in most hoods (the hood was tested and demonstrated safe containment at 60 fpm). To ensure occupant safety, each hood has a digital display indicating the face velocity, with an alarm sounding if it were to go too low and a purge button that allows the occupant to increase volume to 300% of normal if there is a spill. Occupants are educated about the hoods' operations and then provided with large digital displays at the entrance to the lab that indicate total volume of air being exhausted in cubic feet per minute. Lab users know what the volume should be if all hoods are closed and can quickly assess whether a hood was left open and is unnecessarily wasting energy (as Philip Kreycik is doing in the pictures above and below). The newly renovated Jacobsen lab is pursuing a Gold rating from the US Green Building Council's Commercial Interior rating system and has integrated a number of sustainable design elements into the project.

Wednesday, March 18, 2009

NESEA Presentation




On March 11, 2009, Nathan Gauthier was part of the "Best Practices for a Sustainable Campus" session at the NESEA BuildingEnergy 09 conference. Mark Sternick from Dietz and Co. Architects chaired the session and Ellen Watts from Architerra co-presented with Nathan. Ellen presented the results of a survey of higher ed institutions in the Boston Consortium (using absolutely amazing graphics I might add) . Nathan presented on the efforts to green Harvard University. A copy of his presentation, titled Sustainability at Harvard, can be found here.

Sunday, March 8, 2009

Holyoke Wind Turbines

Early this year, Harvard Real Estate Services installed 6 of the AeroVironment AVX1000 architectural wind turbines. Each of the parapet mounted turbines is rated for 1 kilowatt and can spin in winds as slow as 4 mph. Last week I took some time after a meeting to take a few pictures and they were spinning rapidly. While in the meeting in the building's 10th (top) floor minutes before taking the pictures, I didn't notice any noise or vibration. The turbines' inverter has not been connected to the internet yet, but when it is we will be able to monitor their effectiveness.

More information can be found here.

Wednesday, January 14, 2009

Green Campus Loan Fund

Harvard's $12 million revolving loan fund is used to help bridge the gap between capital and operating budgets. Schools and units can borrow money for energy conservation measures and payback the loan as they realize the utility savings, making the project have effectively no impact on the operating budget until the capital is paid for and the savings begin to be realized by the operating budget. More information on the loan fund can be found here. As we look to reduce our greenhouse gas emissions, I've plotted the ROI and absolute savings for all GHG reducing loan fund projects (excluded projects with savings from water or increased recycling) . To date, the 144 projects have borrowed $10,517,000 in capital and are saving $3,772,000 (35.9% return on investment) and 22,647 MTCDE annually. Note that occupant behavior requires an annual commitment of capital while the other loan types require capital funding only once (until the end of the item's useful life). Also, this graph only includes full-cost loans. We also have cost delta loans that are part of major capital projects (fund the cost delta between standard efficiency equipment and premium efficiency equipment).