In a previous post we showed some photos of the commissioning process from the Hip Hop Archive. One of the items we added to our issues list was the lack of a fresh air duct that was supposed to be connected to one of the heat pumps. Though the duct was shown on the construction documents and as-built drawings, we couldn't find it in the field. After a lot of back-and-forth with the contractor, it turns out the duct never made it from the fresh air intake and no fresh air was being provided to the spaces served by this heat pump. The two pictures attached show the same access panel before commissioning (no duct) and after (with duct). The team also found that the filter could not be accessed in one of the other heat pumps, another item that the contractor has since fixed. This is our first attempt at self-commissioning a small fit-out project and the experience proved very valuable.